ABOUT
  • 2020
  • 2019
    EP equipment
    STC equipment
    Plant 7
    02
    EP equipment acquired.
    03
    9- 11th Daido STC furnace will be installed.
    06
    Plant 7 was established.
  • 2018
    Plant 6
    Certification
    Expanded EP equipment
    03
    Plant 6 was established.
    08
    IATF16949 Certified.
    08
    Expanded electro-polishing and baking capacity for larger chamber and got the approval of OLED process by both AMAT and ULVAC.
  • 2017
    Second office
    STC equipment
    05
    Second office building was founded.
    05
    7-8th Daido STC furnace will be installed.
  • 2016
    Expanded carbon steel wire spheroidized annealing
    Equipment acquired
    03
    Plant 2 was expanded for spheroidized annealing carbon steel wire production.
    12
    ECP & EP equipment acquired.
  • 2015
    STC equipment
  • 2014
    KOCH Bullock system
    Plant 5
    Certification
  • 2011
    Su Zhou NewBest
  • 2010
    STC equipment
    Large vacuum chamber
  • 2009
    Expanding ECB facilities
    and factory
  • 2007
    ISO Certified
    Approve by Hitachi
  • 2006
    ECB technical
    transference from KST
  • 2005
  • 2003
    KST memorandum
    cooperation
    EP Dept.
  • 2002
    ITRI technical transference
    Suzhou New Best
  • 2001
    STC equipment
    Plant 2
  • 2000
    Stock Market
  • 1999
    STC equipment
  • 1998
    ISO Certified
    Alloy steel wire
  • 1994
    Carbon steel wire
    Stainless steel wire
  • 1993
    New Best